[{"data":1,"prerenderedAt":988},["ShallowReactive",2],{"blog-pps-mes-plantafel-handwerk":3,"blog-author-pps-mes-plantafel-handwerk":450,"blog-others-pps-mes-plantafel-handwerk":465,"site-banner":508,"header-newest-blog":525,"webinars-next":539,"crafts-grid-simple-all":657,"header-success-stories":747,"feature-topics":769,"header-schnittstellen":963},{"id":4,"title":5,"author":6,"body":7,"category":415,"cta":416,"description":419,"draft":420,"extension":421,"headline":422,"icon":423,"image":424,"imageAlt":425,"meta":426,"navigation":427,"path":428,"publishDate":429,"robots":430,"seo":431,"shortDescription":434,"shortTitle":435,"showHeaderImage":427,"showWidgetNewsletter":420,"slug":436,"social":437,"stem":441,"summary":442,"tags":443,"updatedAt":448,"__hash__":449},"blog\u002Fblog\u002F260819-pps-mes-plantafel-handwerk.md","260819 Pps Mes Plantafel Handwerk","marvin",{"type":8,"value":9,"toc":405},"minimark",[10,19,22,56,61,64,76,86,92,102,105,109,112,115,160,163,167,170,173,213,219,227,230,243,255,258,262,270,278,281,285,291,294,307,310,314],[11,12,13,14,18],"p",{},"Irgendwann fällt der Satz. Der Betrieb ist auf dreißig Leute gewachsen, die Halle läuft voll, und jemand sagt: ",[15,16,17],"em",{},"„Wir brauchen eigentlich ein richtiges Fertigungssystem.“"," Auf der Messe standen Anbieter mit PPS und MES am Stand, im Verband hat einer davon erzählt, und der Berater hat MRP ins Protokoll geschrieben.",[11,20,21],{},"Die Begriffe kommen alle aus der Industrie, und sie beschreiben echte, ausgereifte Systeme. Die Frage ist nur, ob sie für einen Betrieb gebaut sind, der jede Woche etwas anderes fertigt.",[23,24,27],"callout-block",{"title":25,"type":26},"Das Wichtigste in Kürze","tip",[28,29,30,38,44,50],"ul",{},[31,32,33,37],"li",{},[34,35,36],"strong",{},"MES heißt Manufacturing Execution System",", nicht Manufacturing Resource Planning. Das ist MRP II. Die drei Abkürzungen werden oft durcheinandergeworfen.",[31,39,40,43],{},[34,41,42],{},"PPS und MRP planen Material und Mengen."," Sie leben von Stücklisten, die mehr als einmal gelten.",[31,45,46,49],{},[34,47,48],{},"Im Handwerk gilt fast jede Stückliste genau einmal."," Auftragsfertigung schlägt Serienlogik, und damit fällt die Grundlage dieser Systeme weg.",[31,51,52,55],{},[34,53,54],{},"Was bleibt, ist die Steuerung über Zeit:"," welcher Arbeitsschritt liegt in welchem Bereich, wie voll ist die Woche, wann ist er fertig gemeldet.",[57,58,60],"h2",{"id":59},"die-abkürzungen-kurz-und-richtig","Die Abkürzungen, kurz und richtig",[11,62,63],{},"Die vier Begriffe sitzen auf unterschiedlichen Ebenen und werden im Vertrieb gern vermischt. Einmal sortiert:",[11,65,66,69,70,75],{},[34,67,68],{},"ERP (Enterprise Resource Planning)"," ist die kaufmännische Klammer: Angebot, Auftrag, Einkauf, Rechnung, Buchhaltung. Das ist in vielen Handwerksbetrieben die vorhandene Branchenlösung. Eine Einordnung der Software-Typen im Handwerk steht im Artikel zu ",[71,72,74],"a",{"href":73},"\u002Fblog\u002Fhandwerkersoftware-vergleich","Handwerkersoftware im Vergleich",".",[11,77,78,81,82,85],{},[34,79,80],{},"MRP (Material Requirements Planning)"," rechnet aus einer Stückliste und einem Produktionsplan zurück, welches Material wann in welcher Menge gebraucht wird. ",[34,83,84],{},"MRP II",", ausgeschrieben Manufacturing Resource Planning, erweitert das um Kapazitäten und Personal. Das ist die Abkürzung, die viele meinen, wenn sie MES sagen.",[11,87,88,91],{},[34,89,90],{},"PPS (Produktionsplanung und -steuerung)"," ist der deutsche Sammelbegriff für dieselbe Familie: Mengen, Termine, Losgrößen, Maschinenbelegung.",[11,93,94,97,98,101],{},[34,95,96],{},"MES (Manufacturing Execution System)"," sitzt eine Ebene tiefer, direkt an der Fertigung. Es hängt an den Maschinen, holt Betriebsdaten aus der Steuerung, protokolliert Stückzahlen, Gut- und Schlechtmengen und macht einzelne Teile über die ganze Fertigung nachvollziehbar. ",[34,99,100],{},"APS (Advanced Planning and Scheduling)"," legt darüber einen Optimierer, der Reihenfolgen rechnet.",[11,103,104],{},"Alle vier sind für einen Zustand gebaut, den es in der Industrie gibt und in der Werkstatt nicht.",[57,106,108],{"id":107},"der-eine-unterschied-der-alles-entscheidet","Der eine Unterschied, der alles entscheidet",[11,110,111],{},"Diese Systeme rechnen sich über Wiederholung. Eine Stückliste wird einmal gepflegt und tausendmal benutzt. Eine Rüstzeit wird einmal gemessen und über die Losgröße verteilt. Ein Maschinenprogramm läuft eine Schicht lang durch.",[11,113,114],{},"Im Handwerk sieht es anders aus:",[116,117,120,142,148,154],"check-list",{":cols":118,"type":119},"2","cross",[121,122,124],"checklist-item",{"title":123},"Die Stückliste gilt einmal",[11,125,126,127,131,132,136,137,141],{},"Die Treppe ins Dachgeschoss, der Ladenbau nach Zeichnung, das Geländer nach Maß. Wer beim ",[71,128,130],{"href":129},"\u002Fgewerke\u002Fschreiner-tischler","Schreiner",", im ",[71,133,135],{"href":134},"\u002Fgewerke\u002Fmetallbauer","Metallbau"," oder im ",[71,138,140],{"href":139},"\u002Fgewerke\u002Ftreppenbauer","Treppenbau"," eine Stückliste pflegt, pflegt sie für genau einen Auftrag.",[121,143,145],{"title":144},"Es gibt keine Losgröße",[11,146,147],{},"Losgröße eins ist der Normalfall. Eine Optimierung über Seriengrößen hat nichts, worüber sie optimieren könnte.",[121,149,151],{"title":150},"Die Maschine ist selten der Engpass",[11,152,153],{},"Der Engpass ist der Kollege mit dem Schein, das Gerüst auf der anderen Baustelle oder das Material, das nicht kommt. Nicht die CNC.",[121,155,157],{"title":156},"Der Auftrag geht raus",[11,158,159],{},"Nach der Werkstatt kommt die Montage beim Kunden. Ein System, das an der Halle endet, verliert den Auftrag genau dort, wo es teuer wird.",[11,161,162],{},"Das ist keine Kritik an PPS oder MES. Es ist der Grund, warum ihre Einführung in Handwerksbetrieben so oft im Sand verläuft: Der Aufwand steckt in Stammdaten, deren Nutzen sich erst bei Wiederholung einstellt.",[57,164,166],{"id":165},"was-in-der-auftragsfertigung-übrig-bleibt","Was in der Auftragsfertigung übrig bleibt",[11,168,169],{},"Wenn Mengen und Stücklisten als Steuerungsgröße wegfallen, bleibt die Zeit. Und die reicht überraschend weit, wenn man sie konsequent an der Arbeit festmacht statt am Tag.",[11,171,172],{},"Drei Fragen tragen den Alltag in einer Werkstatt mit Einzelfertigung:",[116,174,175,186,197],{},[121,176,179],{"title":177,"icon":178},"Wo liegt die Arbeit gerade?","tabler:layout-board",[11,180,181,182,75],{},"Nicht als Bestand, sondern als Arbeitsschritt in einem Arbeitsbereich: Zuschnitt, Vorfertigung, Oberfläche, Endmontage. Das ist die ",[71,183,185],{"href":184},"\u002Fmitarbeiterplanung\u002Fwerkstattplanung","Werkstattplanung",[121,187,190],{"title":188,"icon":189},"Passt die nächste Woche noch?","tabler:chart-bar",[11,191,192,193,75],{},"Angebot gegen Bedarf, je Bereich statt für das ganze Team. Das ist der Kapazitätsabgleich in der ",[71,194,196],{"href":195},"\u002Fauftragsverwaltung\u002Fkapazitaetsplanung","Kapazitätsplanung",[121,198,201],{"title":199,"icon":200},"Was hat es wirklich gekostet?","tabler:clock-check",[11,202,203,204,208,209,75],{},"Stunden am Arbeitsschritt statt Werkstattstunden als Sammelposten. Aus der ",[71,205,207],{"href":206},"\u002Fzeiterfassung\u002Fprojektzeiterfassung","Projektzeiterfassung"," wird der Soll-Ist-Vergleich in der ",[71,210,212],{"href":211},"\u002Fzeiterfassung\u002Fnachkalkulation","Nachkalkulation",[214,215],"img",{"caption":216,"src":217,"width":218},"Arbeitsvorbereitung, Zuschnitt und Montage als eigene Bereiche mit eigener Auslastung. Rot steht, wo die Woche nicht aufgeht.","\u002Fimages\u002Fuser-manual\u002Farbeitsbereichstafel.webp",700,[11,220,221,222,226],{},"Wer nach einer Produktionssteigerung sucht, findet sie meistens hier und nicht in einem Optimierer. Der Durchsatz einer Werkstatt hängt an Wartezeiten zwischen den Bereichen, an Nacharbeit durch Infos, die nicht angekommen sind, und an Bereichen, die leer laufen, während andere überquillen. Das ist Organisation, nicht Rechenleistung, und deshalb ist es eher ein Thema für die ",[71,223,225],{"href":224},"\u002Fblog\u002Fprozessoptimierung","Prozessoptimierung"," als für ein neues System.",[11,228,229],{},"Der zweite Punkt ist die Rückkopplung. Ein PPS-System braucht gepflegte Vorgabezeiten, damit es planen kann. In der Auftragsfertigung entstehen die Erfahrungswerte umgekehrt: Du schätzt einen Arbeitsschritt, dein Team stempelt darauf, und beim nächsten vergleichbaren Auftrag sitzt die Schätzung näher dran. Nach zwei Dutzend Treppen weiß der Betrieb, was eine Treppe dauert, ohne dass jemand Richtzeiten gepflegt hat.",[11,231,232,233,237,238,242],{},"Wie das in einem Betrieb mit echter Einzelfertigung aussieht, steht in der Erfolgsgeschichte von ",[71,234,236],{"href":235},"\u002Ferfolgsgeschichten\u002Fplath","Treppenbau Plath",": Fertigung und Baustellen laufen dort über dieselbe Planung, mit Terminals an den Arbeitsplätzen in der Werkstatt. Dass Losgröße eins auch in der Menge funktioniert, zeigt ",[71,239,241],{"href":240},"\u002Ferfolgsgeschichten\u002Fammann","Ammann Treppenbau"," mit über 2.200 maßgefertigten Treppen im Jahr: Was eine Treppe ausmacht, steht dort nicht in einer Stückliste, sondern im Auftragsdatenblatt am Auftrag.",[11,244,245,246,250,251,75],{},"Du willst wissen, ob deine Werkstatt eher eine Fertigungssteuerung oder eine sauber geplante Tafel braucht? Im ",[71,247,249],{"href":248},"\u002Fdemo-termin","Erstgespräch"," bauen wir deine Arbeitsbereiche einmal nach und schauen uns eine typische Woche bei dir an, oder du ",[71,252,254],{"href":253},"\u002Fjetzt-testen","probierst es direkt selbst aus",[256,257],"cta-buttons",{},[57,259,261],{"id":260},"und-die-rückmeldung-aus-der-halle","Und die Rückmeldung aus der Halle?",[11,263,264,265,269],{},"Das ist der Teil, den ein MES leistet und den Handwerksbetriebe tatsächlich vermissen. Die Baustelle ist längst sichtbar, weil dort Stunden gebucht werden. Die Werkstatt bleibt oft stumm, bis jemand hineingeht und fragt. Genau diese Lücke schließt der ",[71,266,268],{"href":267},"\u002Fdokumentation-kommunikation\u002Fauftragsstatus","Auftragsstatus"," je Arbeitsschritt.",[11,271,272,273,277],{},"Dafür braucht es kein Maschinennetzwerk. Ein Terminal in der Halle genügt: Das Team stempelt per ",[71,274,276],{"href":275},"\u002Fzeiterfassung\u002Frfid","RFID-Chip"," auf den Arbeitsschritt, an dem es steht, öffnet dort die aktuelle Zeichnung und meldet fertig, wenn es fertig ist. Damit ist die Fertigung im Plan sichtbar, und das Büro erfährt einen Verzug, bevor der Montagetermin beim Kunden schon zugesagt ist.",[11,279,280],{},"Was so ein Aufbau nicht liefert: Stückzahlen aus der Steuerung, Ausschussquoten, Werkzeugstandzeiten, Rückverfolgbarkeit einzelner Bauteile. Wer das braucht, weil er in Serie produziert oder zertifizieren muss, braucht ein MES. Das ist dann aber auch ein anderer Betrieb als der, um den es hier geht.",[57,282,284],{"id":283},"woran-du-erkennst-was-zu-dir-passt","Woran du erkennst, was zu dir passt",[11,286,287,288],{},"Eine einzige Frage sortiert das meiste: ",[34,289,290],{},"Wiederholt sich, was du fertigst?",[11,292,293],{},"Wenn dieselbe Baugruppe hundertfach durch die Halle läuft, Material in Losgrößen bestellt wird und Maschinen den Takt vorgeben, dann sind PPS und MES die richtige Familie. Dann führt der Weg zu einem Anbieter aus der Fertigungsindustrie, und die Stammdatenpflege lohnt sich.",[11,295,296,297,301,302,306],{},"Wenn jeder Auftrag ein Unikat ist, Werkstatt und Baustelle sich abwechseln und der Engpass meistens ein Mensch ist, dann ist die Steuerungsgröße die Zeit. Dann brauchst du eine ",[71,298,300],{"href":299},"\u002Fauftragsverwaltung","Auftragsverwaltung"," und eine ",[71,303,305],{"href":304},"\u002Fzeiterfassung","Zeiterfassung",", die Arbeitsschritte, Leute, Bereiche und Termine zusammenhalten, und die auch dann noch gepflegt werden, wenn es hektisch ist.",[11,308,309],{},"Artesa ist für den zweiten Fall gebaut. Es ist ausdrücklich kein PPS-System und kein MES: keine Stücklisten, kein Lager, keine Daten aus der Maschine. Was aus der Halle zurückkommt, meldet der Mitarbeiter selbst. Für Betriebe mit Werkstatt und Baustelle ist das erfahrungsgemäß die Flughöhe, die im Alltag überlebt.",[57,311,313],{"id":312},"häufig-gestellte-fragen","Häufig gestellte Fragen",[315,316,317,324,330,336,342,353,364,379,395],"faq-inline",{},[318,319,321],"collapse-item",{"question":320},"Was ist der Unterschied zwischen PPS und MES?",[11,322,323],{},"Ein PPS-System plant: Es legt fest, welcher Auftrag mit welchem Material in welcher Reihenfolge und auf welcher Maschine läuft. Ein MES führt aus und protokolliert: Es hängt an den Maschinen, holt Betriebsdaten aus der Steuerung und dokumentiert, was tatsächlich passiert ist. PPS ist die Ebene der Planung, MES die Ebene der Fertigung selbst.",[318,325,327],{"question":326},"Heißt MES nicht Manufacturing Resource Planning?",[11,328,329],{},"Nein, das ist eine häufige Verwechslung. MES steht für Manufacturing Execution System. Manufacturing Resource Planning ist MRP II, die um Kapazitäten und Personal erweiterte Variante von MRP (Material Requirements Planning). Drei verschiedene Kategorien mit drei verschiedenen Aufgaben.",[318,331,333],{"question":332},"Braucht ein Handwerksbetrieb ein PPS-System?",[11,334,335],{},"In den meisten Fällen nicht. Der Nutzen eines PPS-Systems entsteht aus Wiederholung: gepflegte Stücklisten, Losgrößen, Vorgabezeiten. In der Auftrags- und Einzelfertigung gilt jede Stückliste einmal, deshalb bleibt der Pflegeaufwand und der Nutzen aus. Betriebe mit echter Serienfertigung sind die Ausnahme, für die es sich rechnet.",[318,337,339],{"question":338},"Ist Artesa ein MES für das Handwerk?",[11,340,341],{},"Nein. Artesa deckt die personenbezogene Rückmeldung ab, also Zeiten und Status je Arbeitsschritt, am Terminal in der Halle oder in der App. Der Kern eines MES fehlt bewusst: keine Anbindung an Maschinensteuerungen, keine Stückzahlen, keine Gut- und Schlechtmengen, keine Rückverfolgbarkeit einzelner Bauteile.",[318,343,345],{"question":344},"Ersetzt so eine Planung unser ERP?",[11,346,347,348,352],{},"Nein, sie ergänzt es. Angebot, Kalkulation, Rechnung und Buchhaltung bleiben dort, wo sie heute sind. Artesa übernimmt die Planungs- und Zeitebene darüber und gibt die erfassten Stunden über ",[71,349,351],{"href":350},"\u002Fschnittstellen","Schnittstellen"," weiter.",[318,354,356],{"question":355},"Was ist mit Kleinserien?",[11,357,358,359,363],{},"Kleinserienfertigung liegt dazwischen und lässt sich mit Arbeitsbereichen und wiederverwendbaren Schrittfolgen gut abbilden. Eine wiederkehrende Fertigung legst du einmal als ",[71,360,362],{"href":361},"\u002Fauftragsverwaltung\u002Fstandardablaeufe","Standardablauf"," an, danach steht die Abfolge samt Dauer bei jedem gleichartigen Auftrag schon da. Was fehlt, ist die Mengen- und Materialseite.",[318,365,367],{"question":366},"Welche Software hilft bei der Werkstatt- und Montageplanung?",[11,368,369,370,373,374,378],{},"Eine, die beide Seiten auf derselben Tafel führt. In Artesa hängen Vorfertigung und Montagetermin am selben Auftrag: Du planst die Halle nach ",[71,371,372],{"href":184},"Arbeitsbereichen"," und die Einsätze vor Ort über die ",[71,375,377],{"href":376},"\u002Fmitarbeiterplanung","Mitarbeiterplanung",". Verschiebt sich die Fertigung, siehst du sofort, welcher Montagetermin mitwandert und bei welchem Kunden du anrufen musst. Getrennte Systeme für drinnen und draußen erzeugen genau diese Lücke.",[318,380,382],{"question":381},"Wie vermeide ich Informationsverluste zwischen Werkstatt, Büro und Baustelle?",[11,383,384,385,389,390,394],{},"Indem alle auf denselben Auftrag schauen statt auf eigene Zettel. Maße, Zeichnungen, Fotos und Änderungen liegen in der ",[71,386,388],{"href":387},"\u002Fauftragsverwaltung\u002Fauftragsakte","Auftragsakte",", Rückfragen laufen über den ",[71,391,393],{"href":392},"\u002Fdokumentation-kommunikation\u002Fauftragschat","Auftragschat"," am Auftrag statt über wechselnde WhatsApp-Gruppen. Eine Maßänderung vom Aufmaß ist damit einmal erfasst und für Konstruktion, Werkstatt und Montage sofort sichtbar. Das ist der häufigste Grund für Nacharbeit, und der billigste zu beheben.",[318,396,398],{"question":397},"Gibt es Förderung für die Digitalisierung im Handwerk?",[11,399,400,401,75],{},"Ja, und zwar überwiegend auf Landesebene. Welche Programme aktuell laufen, was sie fördern und welche Fristen gelten, steht nach Bundesländern sortiert im Artikel zu den ",[71,402,404],{"href":403},"\u002Fblog\u002Ffoerderprogramme","Förderprogrammen für die Digitalisierung im Handwerk",{"title":406,"searchDepth":407,"depth":407,"links":408},"",2,[409,410,411,412,413,414],{"id":59,"depth":407,"text":60},{"id":107,"depth":407,"text":108},{"id":165,"depth":407,"text":166},{"id":260,"depth":407,"text":261},{"id":283,"depth":407,"text":284},{"id":312,"depth":407,"text":313},"Software auswählen",{"title":417,"sub":418},"Plantafel statt Fertigungssteuerung?","Artesa plant Zeit, Leute und Arbeitsbereiche, für Werkstatt und Baustelle zugleich. Teste Artesa 14 Tage kostenlos oder buch dir einen Termin, dann klären wir, wie sich eure Bereiche abbilden lassen.","Irgendwann fällt der Satz. Der Betrieb ist auf dreißig Leute gewachsen, die Halle läuft voll, und jemand sagt: „Wir brauchen eigentlich ein richtiges Fertigungssystem.“ Auf der Messe standen Anbieter mit PPS und MES am Stand, im Verband hat einer davon erzählt, und der Berater hat MRP ins Protokoll geschrieben.",false,"md","PPS, MES oder Plantafel? Was ein Handwerksbetrieb wirklich braucht","tabler:building-factory-2","\u002Fimages\u002Fblog\u002Fpps-mes-plantafel-handwerk.webp","Reihe identischer Treppenstufen auf einem Förderband neben einer einzelnen handgefertigten Bogentreppe auf der Werkbank als Sinnbild für Serienfertigung und Einzelfertigung",{},true,"\u002Fblog\u002F260819-pps-mes-plantafel-handwerk","2026-08-19","index, follow",{"title":432,"description":433},"PPS, MES oder Plantafel im Handwerk?","PPS, MES, MRP und APS kurz erklärt: was die Systeme aus der Industrie leisten, warum Auftragsfertigung andere Regeln hat und was im Handwerk davon trägt.","Industrie-Systeme im Handwerk","PPS, MES oder Plantafel","pps-mes-plantafel-handwerk",{"title":438,"subtitle":439,"shot":424,"caption":440},"Braucht deine Werkstatt wirklich ein PPS-System?","Eine Frage entscheidet es: Wiederholt sich, was du fertigst?","Auf der Messe stehen Anbieter mit PPS und MES am Stand. Klingt nach dem nächsten logischen Schritt, wenn der Betrieb wächst. Nur sind diese Systeme für Serien gebaut. 🪚\n\n▸ MES heißt Manufacturing Execution System, nicht Manufacturing Resource Planning\n▸ PPS und MRP leben von Stücklisten, die mehr als einmal gelten\n▸ Im Handwerk gilt fast jede Stückliste genau einmal\n▸ Was dann bleibt, ist die Steuerung über Zeit\n\nLosgröße eins ist im Handwerk der Normalfall. Damit fällt die Grundlage weg, auf der ein PPS-System seinen Nutzen zieht, und der Pflegeaufwand bleibt trotzdem.\n\n👉 Den ganzen Artikel liest du über den Link in unserer Bio (www.artesa.de\u002Fblog).\n\n#handwerk #handwerkersoftware #werkstatt #einzelfertigung #digitalisierung\n","blog\u002F260819-pps-mes-plantafel-handwerk","\u003Cp>PPS, MES, MRP und APS: Was die Systeme aus der Industrie leisten, warum sie in der Auftragsfertigung ins Leere greifen und welcher Teil davon im Handwerksbetrieb wirklich hilft.\u003C\u002Fp>\n",[444,445,446,196,447,225],"Handwerkersoftware","Softwareauswahl","Werkstatt","Auftragsplanung",null,"ZXd2AdfEiskN6DqTgVN3VWZfqiB1C1nJfkjxb0EWh_I",{"id":451,"draft":420,"email":452,"extension":453,"firstName":454,"image":455,"imageAlt":448,"lastName":456,"meta":457,"phone":458,"role":461,"stem":462,"vcf":463,"__hash__":464},"employees\u002Femployees\u002Fmarvin.yaml","marvin.fink@artesa.de","yaml","Marvin","\u002Fimages\u002Fteam\u002Fmrf.webp","Fink",{},{"office":459,"mobile":460},"+49 381 260 558 51","+49 179 6113203","Geschäftsführer & Leiter Vertrieb","employees\u002Fmarvin","\u002Fvcf\u002Fmarvinfink.vcf","2-0Fsj43bFsDNbTjcWNtTerJQ3oYnSjSCqV5dZBsTZM",[466,477,488,498],{"slug":467,"stem":468,"path":469,"category":415,"draft":420,"headline":470,"image":471,"imageAlt":472,"summary":473,"tags":474,"publishDate":476,"updatedAt":448},"software-wechseln","blog\u002F260817-software-wechseln","\u002Fblog\u002F260817-software-wechseln","Handwerkersoftware wechseln, ohne dass der Betrieb stillsteht","\u002Fimages\u002Fblog\u002Fsoftware-wechseln.webp","Gemalte Illustration eines Werkstattbüros im Umzug: eine offene Umzugskiste mit Ordnern vor einem alten Aktenschrank mit ausgezogenen Schubladen","Wie ein Wechsel abläuft, ohne dass der Betrieb drei Wochen stillsteht.\n",[445,225,475],"Digitalisierung","2026-08-17",{"slug":478,"stem":479,"path":480,"category":415,"draft":420,"headline":481,"image":482,"imageAlt":483,"summary":484,"tags":485,"publishDate":487,"updatedAt":448},"kauf-oder-abo","blog\u002F260813-kauf-oder-abo","\u002Fblog\u002F260813-kauf-oder-abo","Kauf oder Abo: Was Handwerkersoftware über die Jahre kostet","\u002Fimages\u002Fblog\u002Fkauf-oder-abo.webp","Gemalte Illustration einer Werkbank: links eine abgedeckte, stillgelegte Bandsäge mit Handbuchstapel und Beleg, rechts dieselbe Maschine im Einsatz mit Spänen","Einmal-Kauf oder monatliche Miete, und was das über die Jahre wirklich bedeutet.\n",[445,444,486],"Unternehmensberatung","2026-08-13",{"slug":489,"stem":490,"path":491,"category":415,"draft":420,"headline":492,"image":493,"imageAlt":494,"summary":495,"tags":496,"publishDate":497,"updatedAt":448},"cloud-oder-on-premise","blog\u002F260811-cloud-oder-on-premise","\u002Fblog\u002F260811-cloud-oder-on-premise","Cloud oder eigener Server: Wo die Daten deines Betriebs liegen sollten","\u002Fimages\u002Fblog\u002Fcloud-oder-on-premise.webp","Gemalte Illustration: links ein Serverschrank im dunklen Abstellraum hinter Eimer und Farbdosen, rechts ein offener Werkzeugkoffer auf der Ladeklappe im Tageslicht","Wo die Daten liegen, wer sie sichert und was die DSGVO damit zu tun hat.\n",[445,475,351],"2026-08-11",{"slug":499,"stem":500,"path":501,"category":415,"draft":420,"headline":502,"image":503,"imageAlt":504,"summary":505,"tags":506,"publishDate":507,"updatedAt":448},"was-kostet-handwerkersoftware","blog\u002F260807-was-kostet-handwerkersoftware","\u002Fblog\u002F260807-was-kostet-handwerkersoftware","Was kostet eine Handwerkersoftware – und was spart sie wirklich?","\u002Fimages\u002Fblog\u002Fwas-kostet-handwerkersoftware.webp","Gemalte Illustration einer Balkenwaage auf einer Werkbank: in der einen Schale ein paar Münzen und ein Beleg für die Kosten einer Handwerkersoftware, in der anderen Sanduhren, Maßband und ein Stapel Stundenzettel für die eingesparte Zeit","\u003Cp>69 % der Handwerksbetriebe nennen hohe Investitionskosten als größtes Hemmnis für die Digitalisierung. Bei vielen Anbietern steht der Preis aber erst auf Anfrage. Hier stehen beide Seiten der Rechnung: was anfällt und was zurückkommt.\u003C\u002Fp>\n",[444,475,445],"2026-08-07",{"id":509,"title":510,"active":427,"body":511,"color":518,"description":406,"extension":421,"meta":519,"navigation":427,"pages":520,"path":521,"seo":522,"stem":523,"__hash__":524},"bannerContent\u002Fbanner.md","Banner",{"type":8,"value":512,"toc":516},[513],[514,515],"next-webinar-banner",{},{"title":406,"searchDepth":407,"depth":407,"links":517},[],"primary",{},{},"\u002Fbanner",{"title":510,"description":406},"banner","x5aPzpKRkSBoonYwBIvjv914W3tuX_RxPOqfH16SJco",[526,529,532,535,538],{"title":527,"slug":528},"Trello, Asana und MS Teams im Handwerk: gut für Aufgaben, blind für Kapazität","trello-asana-teams-handwerk",{"title":530,"slug":531},"WhatsApp im Betrieb: schnell verschickt, später nicht auffindbar","whatsapp-im-handwerk",{"title":533,"slug":534},"Digitale oder analoge Plantafel? Was die Magnettafel kann und wo sie aufhört","plantafel-digital-oder-analog",{"title":536,"slug":537},"Mitarbeiter mit Outlook planen: wo der Kalender aufhört","mitarbeiterplanung-mit-outlook",{"title":422,"slug":436},[540,552,569,580,591,602,613,624,635,646],{"id":541,"title":542,"callToAction":448,"category":543,"description":544,"draft":420,"end":448,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":545,"meta":547,"organizer":448,"start":548,"stem":549,"url":550,"__hash__":551},"events\u002Fevents\u002Fwebinar-digitale-planung-2026.yaml","Webinar: Digitale Planung mit Artesa","Webinar","Im praxisnahen Live-Einblick erfährst du als Artesa-Neuling alles wichtige zur Software und wie du damit arbeitest.",{"name":546},"Online via Teams",{},"2026-01-27","events\u002Fwebinar-digitale-planung-2026","https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002F3619355f-0a41-4b0b-acec-a562c7b9e0c3@2865933d-64a6-4c0b-8170-1f161587b1df","A6Uo_KgvsXZtqRZEV2brZC9CxN5NDs449mNFHGbrKUo",{"id":553,"title":554,"callToAction":555,"category":543,"description":561,"draft":420,"end":562,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":563,"meta":565,"organizer":448,"start":566,"stem":567,"url":448,"__hash__":568},"events\u002Fevents\u002Fwebinar-live-2026-05-12.yaml","Artesa Live-Webinar",[556],{"text":557,"url":558,"icon":559,"target":560},"Jetzt anmelden","https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002FREPLACE_ME_2026-05-12","tabler:brand-teams","_blank","30 Minuten praxisnah und hands-on: Wir zeigen dir live, wie du mit Artesa arbeitest, und beantworten deine Fragen – egal ob du Artesa gerade kennenlernst, in der Demo steckst oder mitten in der Einrichtung bist.","2026-05-12T15:30:00+02:00",{"name":564},"Online via Microsoft Teams",{},"2026-05-12T15:00:00+02:00","events\u002Fwebinar-live-2026-05-12","drsvIQVStd-obdJhQ3sQv4Rq3AsR-k7ZFCKPQyiQEMA",{"id":570,"title":554,"callToAction":571,"category":543,"description":561,"draft":420,"end":574,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":575,"meta":576,"organizer":448,"start":577,"stem":578,"url":448,"__hash__":579},"events\u002Fevents\u002Fwebinar-live-2026-05-26.yaml",[572],{"text":557,"url":573,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002FREPLACE_ME_2026-05-26","2026-05-26T15:30:00+02:00",{"name":564},{},"2026-05-26T15:00:00+02:00","events\u002Fwebinar-live-2026-05-26","rdQgcSZBpA7svI7zkttUg9ZH1w2k5qskMoQ78lsDBLo",{"id":581,"title":554,"callToAction":582,"category":543,"description":561,"draft":420,"end":585,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":586,"meta":587,"organizer":448,"start":588,"stem":589,"url":448,"__hash__":590},"events\u002Fevents\u002Fwebinar-live-2026-07-21.yaml",[583],{"text":557,"url":584,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002F8b10f62c-59db-42dd-86f4-17e8a6a29f18@2865933d-64a6-4c0b-8170-1f161587b1df","2026-07-21T15:30:00+02:00",{"name":564},{},"2026-07-21T15:00:00+02:00","events\u002Fwebinar-live-2026-07-21","krer4ljZVnECFwLuTU6OcYa-582fUbRj0aYI_JF1Gnc",{"id":592,"title":554,"callToAction":593,"category":543,"description":561,"draft":420,"end":596,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":597,"meta":598,"organizer":448,"start":599,"stem":600,"url":448,"__hash__":601},"events\u002Fevents\u002Fwebinar-live-2026-08-04.yaml",[594],{"text":557,"url":595,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002F85911b31-6c2d-4da1-affa-d52b9f348819@2865933d-64a6-4c0b-8170-1f161587b1df","2026-08-04T15:30:00+02:00",{"name":564},{},"2026-08-04T15:00:00+02:00","events\u002Fwebinar-live-2026-08-04","-VMZWG9th8sZ3hSOjgDv54QWZ6Qa81pN7Dk0E9Qul8M",{"id":603,"title":554,"callToAction":604,"category":543,"description":561,"draft":420,"end":607,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":608,"meta":609,"organizer":448,"start":610,"stem":611,"url":448,"__hash__":612},"events\u002Fevents\u002Fwebinar-live-2026-08-18.yaml",[605],{"text":557,"url":606,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002F19d88cff-9268-4d32-9195-279ce8aa69c5@2865933d-64a6-4c0b-8170-1f161587b1df","2026-08-18T15:30:00+02:00",{"name":564},{},"2026-08-18T15:00:00+02:00","events\u002Fwebinar-live-2026-08-18","H_vn2TTP_t-YbbnzDJ51VV2WzNeY2BkZZoQTLTwA4Us",{"id":614,"title":554,"callToAction":615,"category":543,"description":561,"draft":420,"end":618,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":619,"meta":620,"organizer":448,"start":621,"stem":622,"url":448,"__hash__":623},"events\u002Fevents\u002Fwebinar-live-2026-09-01.yaml",[616],{"text":557,"url":617,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002F03bbd9f4-0450-477c-be61-6c1331b0e9d8@2865933d-64a6-4c0b-8170-1f161587b1df","2026-09-01T15:30:00+02:00",{"name":564},{},"2026-09-01T15:00:00+02:00","events\u002Fwebinar-live-2026-09-01","7BtMVrLLBufJbSYJhebVec9pA7cnD8CvOJHoLVIdDCs",{"id":625,"title":554,"callToAction":626,"category":543,"description":561,"draft":420,"end":629,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":630,"meta":631,"organizer":448,"start":632,"stem":633,"url":448,"__hash__":634},"events\u002Fevents\u002Fwebinar-live-2026-09-15.yaml",[627],{"text":557,"url":628,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002F1137d8e2-c467-411e-a353-8894e39e99b6@2865933d-64a6-4c0b-8170-1f161587b1df","2026-09-15T15:30:00+02:00",{"name":564},{},"2026-09-15T15:00:00+02:00","events\u002Fwebinar-live-2026-09-15","-PPSokmGLLQ0o72andGRwnZC9Jm0WW8m5RXq93M0jaw",{"id":636,"title":554,"callToAction":637,"category":543,"description":561,"draft":420,"end":640,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":641,"meta":642,"organizer":448,"start":643,"stem":644,"url":448,"__hash__":645},"events\u002Fevents\u002Fwebinar-live-2026-09-29.yaml",[638],{"text":557,"url":639,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002Fe6a0bcdb-440d-42e4-b48f-0fb81f698a1c@2865933d-64a6-4c0b-8170-1f161587b1df","2026-09-29T15:30:00+02:00",{"name":564},{},"2026-09-29T15:00:00+02:00","events\u002Fwebinar-live-2026-09-29","jfLtF-fINmuEl7vbJL5-XF09Figs-0dL2m85H9PPfos",{"id":647,"title":554,"callToAction":648,"category":543,"description":561,"draft":420,"end":651,"extension":453,"image":448,"imageAlt":448,"isAllDay":420,"location":652,"meta":653,"organizer":448,"start":654,"stem":655,"url":448,"__hash__":656},"events\u002Fevents\u002Fwebinar-live-2026-10-13.yaml",[649],{"text":557,"url":650,"icon":559,"target":560},"https:\u002F\u002Fevents.teams.microsoft.com\u002Fevent\u002Feb8e5ad2-b83c-4375-9c3b-13f1b22c7cbb@2865933d-64a6-4c0b-8170-1f161587b1df","2026-10-13T15:30:00+02:00",{"name":564},{},"2026-10-13T15:00:00+02:00","events\u002Fwebinar-live-2026-10-13","yhmbvMXUTITF-S28C9K0FvwezK6RBZuI6Zxw1P9yVMw",[658,663,668,673,678,683,688,693,698,703,708,713,718,723,728,733,738,743],{"title":659,"icon":660,"slug":661,"stem":662,"nav":427,"hasDetailPage":427,"draft":420},"Bauelemente","hugeicons:door","bauelemente","crafts\u002Fbauelemente",{"title":664,"icon":665,"slug":666,"stem":667,"nav":427,"hasDetailPage":427,"draft":420},"Boden- und Fliesenleger","icon-park-outline:floor-tile","fliesenleger","crafts\u002Fboden-und-fliesenleger",{"title":669,"icon":670,"slug":671,"stem":672,"nav":427,"hasDetailPage":427,"draft":420},"Dachdecker & Zimmerer","material-symbols:roofing-outline-rounded","dachdecker","crafts\u002Fdachdecker",{"title":674,"icon":675,"slug":676,"stem":677,"nav":427,"hasDetailPage":427,"draft":420},"Elektriker","ic:baseline-electrical-services","elektriker","crafts\u002Felektriker",{"title":679,"icon":680,"slug":681,"stem":682,"nav":427,"hasDetailPage":427,"draft":420},"Fensterbauer","fluent-emoji-high-contrast:window","fensterbauer","crafts\u002Ffensterbauer",{"title":684,"icon":685,"slug":686,"stem":687,"nav":427,"hasDetailPage":427,"draft":420},"Garten- und Landschaftsbauer","ph:tree-duotone","galabauer","crafts\u002Fgarten-und-landschaftsbauer",{"title":689,"icon":690,"slug":691,"stem":692,"nav":427,"hasDetailPage":427,"draft":420},"Gerüstbauer","material-symbols-light:shelves-outline-rounded","geruestbauer","crafts\u002Fgeruestbauer",{"title":694,"icon":695,"slug":696,"stem":697,"nav":420,"hasDetailPage":427,"draft":420},"Hausverwaltung","tabler:building-community","hausverwaltung","crafts\u002Fhausverwaltung",{"title":699,"icon":700,"slug":701,"stem":702,"nav":420,"hasDetailPage":427,"draft":420},"Hoch- und Tiefbauer","fa6-solid:trowel-bricks","hoch-tiefbauer","crafts\u002Fhoch-und-tiefbauer",{"title":704,"icon":705,"slug":706,"stem":707,"nav":420,"hasDetailPage":427,"draft":420},"Holzbauer","mdi:forest","holzbauer","crafts\u002Fholzbauer",{"title":709,"icon":710,"slug":711,"stem":712,"nav":420,"hasDetailPage":427,"draft":420},"KFZ","mdi:car-wrench","kfz","crafts\u002Fkfz",{"title":714,"icon":715,"slug":716,"stem":717,"nav":420,"hasDetailPage":427,"draft":420},"Maler und Lackierer","ri:paint-brush-line","maler-lackierer","crafts\u002Fmaler-und-lackierer",{"title":719,"icon":720,"slug":721,"stem":722,"nav":427,"hasDetailPage":427,"draft":420},"Maschinen- und Anlagenbauer","tabler:settings-automation","maschinen-anlagenbauer","crafts\u002Fmaschinen-anlagenbauer",{"title":724,"icon":725,"slug":726,"stem":727,"nav":427,"hasDetailPage":427,"draft":420},"Metallbauer und Schlosser","tabler:arrow-up","metallbauer","crafts\u002Fmetallbauer-und-schlosser",{"title":729,"icon":730,"slug":731,"stem":732,"nav":427,"hasDetailPage":427,"draft":420},"Sanitär, Heizung, Klima","ic:baseline-plumbing","shk","crafts\u002Fsanitaer-heizung-klima",{"title":734,"icon":735,"slug":736,"stem":737,"nav":427,"hasDetailPage":427,"draft":420},"Schreiner und Tischler","mdi:circular-saw","schreiner-tischler","crafts\u002Fschreiner-und-tischler",{"title":739,"icon":740,"slug":741,"stem":742,"nav":427,"hasDetailPage":427,"draft":420},"Treppenbauer","tabler:stairs","treppenbauer","crafts\u002Ftreppenbauer",{"title":744,"icon":745,"slug":448,"stem":746,"nav":420,"hasDetailPage":420,"draft":420},"und viele mehr...","ci:users-group","crafts\u002Fund-viele-mehr",[748,753,758,763],{"company":749,"meta":750,"logo":751,"logoBackgroundColor":752,"url":240},"Ammann Treppen","Treppenbau · 60 Mitarbeiter","\u002Fimages\u002Fkunden\u002Fammann.svg","#ffffff",{"company":754,"meta":755,"logo":756,"logoBackgroundColor":752,"url":757},"Objekteinrichtung Hengelhaupt","Innenausbau · ~60 Mitarbeiter","\u002Ftestimonials\u002Fhengelhaupt\u002Flogo.webp","\u002Ferfolgsgeschichten\u002Fhengelhaupt",{"company":759,"meta":760,"logo":761,"logoBackgroundColor":752,"url":762},"PEHA Reparatur und Anlagenbau","Anlagenbau · 21 Mitarbeiter","\u002Fimages\u002Fkunden\u002Fpeha.webp","\u002Ferfolgsgeschichten\u002Fpeha",{"company":764,"meta":765,"logo":766,"logoBackgroundColor":767,"url":768},"Tahn Gerüstbau","Gerüstbau · 18 Mitarbeiter","\u002Ftestimonials\u002Ftahn\u002Flogo.svg","#202A6A","\u002Ferfolgsgeschichten\u002Ftahn",[770,774,778,782,784,789,793,798,802,805,810,815,820,825,831,836,841,846,851,856,861,866,872,876,881,886,891,895,897,903,907,912,917,922,928,933,938,941,944,949,953,958],{"title":388,"icon":771,"description":772,"url":387,"parentSlug":773},"tabler:folder","Alles zum Auftrag an einem Ort","auftragsverwaltung",{"title":447,"icon":775,"description":776,"url":777,"parentSlug":773},"tabler:calendar-time","Aufträge in Arbeitsschritte zerlegen","\u002Fauftragsverwaltung\u002Fauftragsplanung",{"title":779,"icon":695,"description":780,"url":781,"parentSlug":773},"Baustellenplanung","Die ganze Laufzeit im Blick","\u002Fauftragsverwaltung\u002Fbaustellenplanung",{"title":196,"icon":189,"description":783,"url":195,"parentSlug":773},"Passt die Zusage überhaupt hinein?",{"title":785,"icon":786,"description":787,"url":788,"parentSlug":773},"Projektmanagement","tabler:building-arch","Mehrere Bauvorhaben gleichzeitig","\u002Fauftragsverwaltung\u002Fprojektmanagement",{"title":790,"icon":791,"description":792,"url":361,"parentSlug":773},"Standardabläufe","tabler:repeat","Wiederkehrendes einmal anlegen",{"title":794,"icon":795,"description":796,"url":797,"parentSlug":773},"Terminplanung","tabler:calendar-event","Termine am Auftrag statt im Kalender","\u002Fauftragsverwaltung\u002Fterminplanung",{"title":393,"icon":799,"description":800,"url":392,"parentSlug":801},"tabler:message-circle","Absprachen statt Suche im WhatsApp-Verlauf","dokumentation-kommunikation",{"title":268,"icon":803,"description":804,"url":267,"parentSlug":801},"tabler:progress-check","Wo steckt der Auftrag gerade?",{"title":806,"icon":807,"description":808,"url":809,"parentSlug":801},"Baustellendokumentation","tabler:crane","Lückenlos statt nachträglich rekonstruiert","\u002Fdokumentation-kommunikation\u002Fbaustellendokumentation",{"title":811,"icon":812,"description":813,"url":814,"parentSlug":801},"Checklisten","tabler:list-check","Jeder Auftrag läuft gleich ab","\u002Fdokumentation-kommunikation\u002Fchecklisten",{"title":816,"icon":817,"description":818,"url":819,"parentSlug":801},"Fotodokumentation","tabler:camera","Mit Fotos belegen, was vor Ort war","\u002Fdokumentation-kommunikation\u002Ffotodokumentation",{"title":821,"icon":822,"description":823,"url":824,"parentSlug":801},"Handwerker-App","tabler:device-mobile","Stempeln ohne etwas zu installieren","\u002Fdokumentation-kommunikation\u002Fhandwerker-app",{"title":826,"icon":827,"description":828,"url":829,"parentSlug":830},"Abnahmeprotokoll","tabler:checkbox","Abnahme belegen, Mängel festhalten","\u002Fformulare\u002Fabnahmeprotokoll","formulare",{"title":832,"icon":833,"description":834,"url":835,"parentSlug":830},"Aufmaßblatt","tabler:ruler-measure","Maße, Skizze und Foto vor Ort","\u002Fformulare\u002Faufmassblatt",{"title":837,"icon":838,"description":839,"url":840,"parentSlug":830},"Auftragsdatenblatt","tabler:file-description","Die Eckdaten für alle verfügbar","\u002Fformulare\u002Fauftragsdatenblatt",{"title":842,"icon":843,"description":844,"url":845,"parentSlug":830},"Bautagesbericht","tabler:notebook","Wetter, Besetzung und Behinderungen je Tag","\u002Fformulare\u002Fbautagesbericht",{"title":847,"icon":848,"description":849,"url":850,"parentSlug":830},"Digitale Unterschrift","tabler:signature","Auf dem Handy unterschreiben lassen","\u002Fformulare\u002Fdigitale-unterschrift",{"title":852,"icon":853,"description":854,"url":855,"parentSlug":830},"Prüfprotokoll","tabler:clipboard-check","Prüfungen lückenlos belegen","\u002Fformulare\u002Fpruefprotokoll",{"title":857,"icon":858,"description":859,"url":860,"parentSlug":830},"Regiebericht","tabler:receipt","Regiearbeiten nachweisbar abrechnen","\u002Fformulare\u002Fregiebericht",{"title":862,"icon":863,"description":864,"url":865,"parentSlug":830},"Wartungsprotokoll","tabler:tool","Jede Wartung später nachvollziehbar","\u002Fformulare\u002Fwartungsprotokoll",{"title":867,"icon":868,"description":869,"url":870,"parentSlug":871},"Disposition","tabler:arrows-shuffle","Störfälle ohne Umwerfen der Woche","\u002Fmitarbeiterplanung\u002Fdisposition","mitarbeiterplanung",{"title":873,"icon":178,"description":874,"url":875,"parentSlug":871},"Einsatzplanung","Wer ist wo, wer ist frei","\u002Fmitarbeiterplanung\u002Feinsatzplanung",{"title":877,"icon":878,"description":879,"url":880,"parentSlug":871},"Kolonnenplanung","tabler:users-group","Eingespielte Trupps als Einheit planen","\u002Fmitarbeiterplanung\u002Fkolonnenplanung",{"title":882,"icon":883,"description":884,"url":885,"parentSlug":871},"Montageplanung","tabler:tools","Vorfertigung, Team und Baustelle","\u002Fmitarbeiterplanung\u002Fmontageplanung",{"title":887,"icon":888,"description":889,"url":890,"parentSlug":871},"Digitale Plantafel","tabler:table","Die Magnettafel für unterwegs","\u002Fmitarbeiterplanung\u002Fplantafel",{"title":892,"icon":863,"description":893,"url":894,"parentSlug":871},"Serviceaufträge und Wartung","Wiederkehrende Termine und Störungen","\u002Fmitarbeiterplanung\u002Fserviceauftraege",{"title":185,"icon":423,"description":896,"url":184,"parentSlug":871},"Bereiche, Maschinen und Vorfertigung",{"title":898,"icon":899,"description":900,"url":901,"parentSlug":902},"Abwesenheitskalender","tabler:calendar-month","Wer wann weg ist, auf einen Blick","\u002Furlaubsplanung\u002Fabwesenheitskalender","urlaubsplanung",{"title":904,"icon":795,"description":905,"url":906,"parentSlug":902},"Abwesenheitsplanung","Urlaub direkt in der Einsatzplanung","\u002Furlaubsplanung\u002Fabwesenheitsplanung",{"title":908,"icon":909,"description":910,"url":911,"parentSlug":902},"Berufsschule und Weiterbildung","tabler:school","Schultage und Lehrgänge früh einplanen","\u002Furlaubsplanung\u002Fberufsschule",{"title":913,"icon":914,"description":915,"url":916,"parentSlug":902},"Krankmeldung","tabler:first-aid-kit","Wenn morgens um sieben jemand ausfällt","\u002Furlaubsplanung\u002Fkrankmeldung",{"title":918,"icon":919,"description":920,"url":921,"parentSlug":902},"Urlaubsantrag","tabler:file-check","Per App beantragen, per Klick freigeben","\u002Furlaubsplanung\u002Furlaubsantrag",{"title":923,"icon":924,"description":925,"url":926,"parentSlug":927},"Arbeitszeiterfassung Pflicht","tabler:scale","Was dokumentiert werden muss","\u002Fzeiterfassung\u002Farbeitszeiterfassung-pflicht","zeiterfassung",{"title":929,"icon":930,"description":931,"url":932,"parentSlug":927},"Arbeitszeitkonto","tabler:hourglass","Soll gegen Ist, Monat für Monat","\u002Fzeiterfassung\u002Farbeitszeitkonto",{"title":934,"icon":935,"description":936,"url":937,"parentSlug":927},"GPS-Zeiterfassung","tabler:map-pin","Standort beim Stempeln, ohne Dauerortung","\u002Fzeiterfassung\u002Fgps-tracking",{"title":212,"icon":939,"description":940,"url":211,"parentSlug":927},"tabler:calculator","Was der Auftrag wirklich gekostet hat",{"title":207,"icon":942,"description":943,"url":206,"parentSlug":927},"tabler:briefcase","Welche Stunden auf welchem Auftrag",{"title":945,"icon":946,"description":947,"url":948,"parentSlug":927},"Rapportzettel","tabler:clipboard-text","Leistung vor Ort unterschreiben lassen","\u002Fzeiterfassung\u002Frapportzettel",{"title":950,"icon":951,"description":952,"url":275,"parentSlug":927},"RFID-Zeiterfassung","tabler:id","Stempeln per Chip am Terminal",{"title":954,"icon":955,"description":956,"url":957,"parentSlug":927},"Digitaler Stundenzettel","tabler:file-text","Grundlage für Lohn und Nachkalkulation","\u002Fzeiterfassung\u002Fstundenzettel",{"title":959,"icon":960,"description":961,"url":962,"parentSlug":927},"Überstunden","tabler:clock-plus","Sehen, wer wie viel geschoben hat","\u002Fzeiterfassung\u002Fueberstunden",[964,967,970,973,976,979,982,985],{"title":965,"stem":966,"hasDetailPage":427},"Excel \u002F CSV","apis\u002Fexcel",{"title":968,"stem":969,"hasDetailPage":420},"HubSpot","apis\u002Fhubspot",{"title":971,"stem":972,"hasDetailPage":427},"Kalender","apis\u002Fkalender",{"title":974,"stem":975,"hasDetailPage":427},"Lexware Office","apis\u002Flexware-office",{"title":977,"stem":978,"hasDetailPage":427},"Moser Mosaik","apis\u002Fmosaik",{"title":980,"stem":981,"hasDetailPage":427},"n8n","apis\u002Fn8n",{"title":983,"stem":984,"hasDetailPage":427},"Pinncalc Corpora","apis\u002Fpinncalc-corpora",{"title":986,"stem":987,"hasDetailPage":427},"REST API","apis\u002Frest-api",1788360697083]